Change requests published (article from October 2024)

Date: 17/12/2024

Product type: Operational Guidance

Four change requests have been approved for publication, with the updated or new (guidance and training specification) content uploaded to our website.
Change request 100: Fires in buildings under construction or demolition
  • Hazard – Fires in timber buildings under construction (updates)
  • Control measure – Carry out Appropriate intervention: Fires in timber buildings under construction (updates)
  • Control measure – Carry out External surveys: Fires in timber buildings under construction (updates)
  • Control measure – Provide external protection: Fires in timber buildings under construction (amalgamated and archived)
  • Control measure – Assess the building involved in fire for signs of collapse (updated and appears in Fires in buildings and Fires in buildings under construction or demolition)
Change request 101: Operations – Right Care, Right Person
  • Hazard – People (updated)
  • Control measure – Seek assistance for dealing with people (updated)
Change request 102: Utilities and fuel – Rechargeable batteries
  • Hazard – Rechargeable batteries (updated)
  • Control measure – Identify the presence and type of rechargeable batteries (updated)
  • Control measure – Isolate rechargeable batteries (updated)
  • Control measure – Safe system of work: Rechargeable batteries (updated)
Change request 103: Corporate guidance for operational activity
  • Control measure – Location Notices (new)