Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Change requests published (article from October 2024)

Date: 17/12/2024

Product type: Operational Guidance

Four change requests have been approved for publication, with the updated or new (guidance and training specification) content uploaded to our website.
Change request 100: Fires in buildings under construction or demolition
  • Hazard – Fires in timber buildings under construction (updates)
  • Control measure – Carry out Appropriate intervention: Fires in timber buildings under construction (updates)
  • Control measure – Carry out External surveys: Fires in timber buildings under construction (updates)
  • Control measure – Provide external protection: Fires in timber buildings under construction (amalgamated and archived)
  • Control measure – Assess the building involved in fire for signs of collapse (updated and appears in Fires in buildings and Fires in buildings under construction or demolition)
Change request 101: Operations – Right Care, Right Person
  • Hazard – People (updated)
  • Control measure – Seek assistance for dealing with people (updated)
Change request 102: Utilities and fuel – Rechargeable batteries
  • Hazard – Rechargeable batteries (updated)
  • Control measure – Identify the presence and type of rechargeable batteries (updated)
  • Control measure – Isolate rechargeable batteries (updated)
  • Control measure – Safe system of work: Rechargeable batteries (updated)
Change request 103: Corporate guidance for operational activity
  • Control measure – Location Notices (new)