Lifts and lift keys

Date: 23/10/2025

Product type: Operational Guidance

Product area: Operations

Link: Lift access to upper floors or basements in a building

On 22 October 2025, the Operational Preparedness, Response and Resilience Committee approved change request GTI CC 003. This change request addresses Grenfell Tower Phase 2 recommendations 113.43, including issues such as:

  • Ensuring firefighters have access to the right keys to operate the firefighters’ lift control
  • Ensuring firefighters know how to operate the firefighters’ lift control

This change request provides a new hazard and two new control measures, which will reside in the Operations guidance. There are five new strategic actions:

  • SA-183452
  • SA-183455
  • SA-183458
  • SA-183460
  • SA-183462

Within the Fires in buildings – Building supplementary information sheets:

  • Content updated in the retitled ‘Lifts for use by firefighters’
  • New content added for ‘Evacuation lifts’